Part 4 – Review CCM Step Interaction Matrix Dynamically
1 Review CCM-Step-Interaction-Matrix Dynamically
The following file is used in this documentation:
- folder: Projects>>CDL-VRT-2023>>P6-FRS-Functional-Requirement-Specification
- file: P6-CDL-FRS-01-UmV340-YN-v01a.xlsm
FRS work process is divided into six parts:
Index | Description |
---|---|
Part 1 | Assign IO to CCM and CM |
Part 2 | Mode of Operation, Steps and Transitions |
Part 3 | Build CCM-Step-Interaction-Matrix |
Part 4 | Review Build CCM-Step-Interaction-Matrix Dynamically |
Part 5 | Review the pCode and Dictionary |
Part 6 | Build and Modify DSS and SOP |
In this section the Part 4 - Review Build CCM-Step-Interaction-Matrix Dynamically is documented.
1.1 Tasks Summary
The following worksheets in the FRS workbook are reviewed and explained:
- {B1-IO}
- {C5-CCM-Steps}
Do the following Tasks where
N | Task | Sheet | Command |
---|---|---|---|
4.1 | Generate URL Objects | A2-UM-Diagram | [B9] Generate URL Objects |
4.2 | Develop the background graphic | A2-UM-Diagram | |
4.3 | Copy the Object from {URL_Objects} | A2-UM-Diagram | |
4.4 | Paste them and place them on the right position | A2-UM-Diagram | |
4.5 | Link the Objects to CCM Step Interaction Matrix {C5-CCM-Steps} | A2-UM-Diagram | [A2] Build URL Link Sheet |
4.6 | Turn Objects Name ON or OFF | A2-UM-Diagram | [A1] Add Remove CM Name |
4.7 | Test the Objects in all Steps for their performance | A2-UM-Diagram | [N] Next or [L] Last |
4.8 | Correct E and N and Repeat Tasks 4.5 to 4.7 | C5-CCM-Steps | |
4.9 | Build Presentation PDF and review with operation | A2-UM-Diagram | [A3] Build Presentation |
1.2 Generate URL Objects
Purpose: The purpose of this task is to generate the DDS sheets for this UM.
To Do: Do the following tasks:
- Select the {A2-UM-Diagram} worksheet
- If you want to start a new diagram, then Delete all objects and data (See Reference A)
- Select the {A2-UM-Diagram} worksheet
- Press CTRL + T keys then click option B9 Generate URL Objects
Click the Yes button
Click the OK button
Select the {URL_Objects} worksheet
The program has generated three set of objects
DO Root-Tags
Steps
Controller and AO Root-Tags
1.3 Develop the background graphic
Purpose: The purpose of this task is to add background drawing for this unit.
To Do: Do the following tasks:
Select the {Graphic_Template} worksheet
Select the following object
Use the Select Object Tool
Select this area
Right Mouse Copy
Select the {A2-UM-Diagram} worksheet
Right Mouse Paste
Right Mouse Group >> Group
The worksheet should look like this
1.4 Copy the Object from {URL_Objects}
Purpose: The purpose of this task is to copy objects created in the previous task to this page
To Do: Do the following tasks:
- Select the {URL_Objects} worksheet (click on cell D1)
Use Object Pointer and select all objects
Copy all
Select the {A2-UM-Diagram} worksheet (click on cell C1)
1.5 Paste them and place them on the right position
Purpose: The purpose of this task is to add alarms to the CCM-Steps Matrix for this UM. In SBC the alarms are enable and disabled per active step.
To Do: Do the following tasks:
Select the {A2-UM-Diagram} worksheet
paste copied objects to the right of the background drawing.
move the objects to the right position
1.6 Link the Objects to CCM Step Interaction Matrix {C5-CCM-Steps}
Purpose: The purpose of this task is to add alarms to the CCM-Steps Matrix for this UM. In SBC the alarms are enable and disabled per active step.
To Do: Do the following tasks:
Select the {A2-UM-Diagram} worksheet
Press CTRL + T keys then click option [A2] Build URL Links Sheet..
- This will build the following table
1.7 Turn Objects Name ON or OFF
Purpose: The purpose of this task is to check the name of the objects
To Do: Do the following tasks:
Select the {A2-UM-Diagram} worksheet
Press CTRL + T keys then click option [A1] Add/Remove ..
The names can be removed by clicking the same command
1.8 Test the Objects in all Steps for their performance
Purpose: The purpose of this task is to add alarms to the CCM-Steps Matrix for this UM. In SBC the alarms are enable and disabled per active step.
To Do: Do the following tasks:
Select the {A2-UM-Diagram} worksheet
Check the diagram for all steps
Press CTRL + T keys then click option [N] Move to Next Step .. or click the [Next] Button
PW Step
FILL Step
RCYL Step
RUN Step
SD Step
1.9 Correct E and N and Repeat Tasks 4.5 to 4.7
Purpose: The purpose of this task is change if needed the CCM-Step-Interaction matrix after review this diagram with operation
To Do: Do the following tasks:
Select the {C5-CCM-Steps} worksheet
Change the E or N if required
Select the {A2-UM-Diagram} worksheet
Press CTRL + T keys then click option [A2] Build URL Links Sheet..
Check
1.10 Build Presentation PDF and review with operation
Purpose: The purpose of this task is to add alarms to the CCM-Steps Matrix for this UM. In SBC the alarms are enable and disabled per active step.
To Do: Do the following tasks:
Select the {A2-UM-Diagram} worksheet
Press CTRL + T keys then click option [A3] Build Presentation ..
This will generate PowerPoint presentation copying R1C1 to R33C25, please click No and change if required.
Click the Yes button
Two set of presentation are made
- PowerPoint
Click on the cell R1C19 for PDF or R2C19 (PowerPoint)
Once PowerPoint file is opened, Save it as GIF
Review the file